Japan FWG: Chemical Dosing Stopped, Output Held

Home 9 Case Studies and Results 9 Japan FWG: Chemical Dosing Stopped, Output Held
Key results
0 chemical dosing
15 t/day output maintained
5+ months stable operation

The Challenges

  • Chemical dosing required to maintain FWG performance
  • Scale build-up on fresh water generator plates
  • Cleaning intervals disrupting operation
  • Need to maintain stable water production

The Solution

One HydroFLOW® HM unit was fitted to the fresh water generator system in January 2016. The signal disrupts the conditions that bond scale to surfaces, so existing deposits soften and become removable by hand while chemical dosing is no longer needed.

Key Outcomes

R

Chemical dosing stopped after installation

R

Scale softened and removable by hand

R

Water production held at around 15 t/day

R

Stable FWG operation over 5 months

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.