Case Study from HYDROPATH The Challenges Floc unstable when polymer dosing was reduced High polymer dosing required to hold stability Risk of floc breakdown at lower dosing Belt press operation became unstable The Solution One HydroFLOW® i120 unit was fitted to the...
The Challenges Ferric dosing fixed at 200 ppm High chemical cost and carbon impact System running near operational limits Risk of fines if limits exceeded The Solution Two HydroFLOW® Custom units (12″ and 14″) were fitted to the DAF feed lines in October...
Case Study from HydroFLOW USA The Challenges High algae and biofouling in the baths Heavy chemical dosing required Frequent blowdowns and water usage High TDS, bacteria and algae levels The Solution One HydroFLOW® i150 unit was fitted to a 6″ fibreglass pipe in...
The Challenges High antiscalant chemical dosing required Ongoing chemical costs and monitoring Risk of calcium carbonate scaling in exchangers Continuous adjustments needed The Solution Three HydroFLOW® Custom 24″ units were fitted to the heat exchanger inlet...
The Challenges Pipeline scaled up twice every year Pump and pipeline needing acid cleaning Downtime affecting continuous production Scale reducing flow performance The Solution One HydroFLOW® P60 unit was fitted to protect the pump and one i100 unit to protect the...