The Challenges Weekly condenser cleaning required ATCS balls replaced every 2 months System shutdowns for maintenance Risk of damage and pipe cutting for ball retrieval The Solution Two HydroFLOW® Custom P units were fitted to the cold feed to the condensers in...
Case Study from HYDROPATH The Challenges Severe struvite scale in centrate lines Frequent maintenance and pipe bypassing Scaling reappearing within weeks Limited access for internal inspection The Solution One HydroFLOW® unit was fitted to the sludge feed pipe in an...
Case Study from HydroFLOW USA The Challenges Recirculating wastewater had a murky appearance Microbial contamination causing strong foul odours Chlorine and polymer dosing needing reduction Cleaning and water replacement too frequent The Solution One HydroFLOW® i150...
Case Study from HydroFLOW Italy The Challenges High turbidity in discharge water Heavy reliance on polyelectrolyte dosing Inconsistent output with turbidity peaks Need to improve efficiency without more chemicals The Solution One HydroFLOW® P60 unit was fitted to the...
Case Study from HYDROPATH The Challenges High polymer dosing needed on dewatering Risk of floc loss at lower dose Cake dryness to be held near 21% for the THP Centrate quality to stay within process limits The Solution One HydroFLOW® i160 unit was fitted to the...