Hydropath Technology logo
  • Home
  • How It Works
  • Applications
        • Scale & deposits
          • Limescale, gypsum & mineral scale
          • Struvite control
        • Fouling, bacteria & corrosion
          • Biofouling & biofilm control
          • Legionella control
          • Corrosion control
        • Cooling & heating
          • Cooling tower
          • Heat exchangers
          • Boilers & steam
          • Misting & spray systems
        • Wastewater & filtration
          • Flocculation & filtration
          • Dissolved air flotation (DAF)
          • Sludge dewatering, centrifuges & belt presses
          • Reverse osmosis
        • How the signal works →See it proven in the field →
  • Industries
        • Buildings & Facilities
          • Commercial buildings & facilities
          • Hotels
          • Hospitals
          • Data centres
        • Industrial Process
          • Manufacturing, industrial & mining
          • Food & beverage
          • Water & wastewater utilities
        • Specialist Sectors
          • Power Plants
          • Desalination
          • Marine & shipping
          • Agriculture
          • Swimming pools & leisure
        • Case studies by sector →Talk to an engineer →
  • Products
    • Residential
      • Pearl
      • Pearl Plus
      • HS40
    • Commercial
      • C Range
      • K40 Aquaklear
      • P Range
    • Industrial
      • I Industrial Range
      • Custom Range
      • Multihead Range
      • HM Range
    • Monitoring
      • HydroKNCT & Hydropath Care
    • Which unit do I need? Take the 2-minute quiz →Commercial & industrial (UK): contact us for pricing →Outside the UK? Find your distributor →
  • Case Studies
  • Insights
  • About
    • Why Us?
    • Find a Distributor
    • Become a Distributor
  • Shop
  • Contact
Indiana Hospital: Legionella Below 1 CFU/mL in 16 Days

Indiana Hospital: Legionella Below 1 CFU/mL in 16 Days

by Hydropath | Jul 25, 2026 | Case Studies and Results

Case Study from HydroFLOW USA The Challenge Quarterly tests showed Legionella above the 1 CFU/mL target Average contamination level reached 7 CFU/mL Flushing and equipment replacement were expensive A $75,000 treatment system was being considered The Solution A...
Chile Desalination: 223 Days No Intake Cleaning

Chile Desalination: 223 Days No Intake Cleaning

by Hydropath | Jul 23, 2026 | Case Studies and Results

Case Study from HydroFLOW Chile The Challenge Mussels and marine organisms built up inside suction lines Blockages reduced flow and affected operational efficiency Frequent maintenance was needed due to fouling regrowth Chemical dosing risked higher cost and...
Italy Potabilization Plant: RO Protected at 840 ppm

Italy Potabilization Plant: RO Protected at 840 ppm

by Hydropath | Jul 23, 2026 | Case Studies and Results

Case Study from HydroFLOW Italy The Challenge Water hardness of approximately 840 ppm CaCO₃ Scaling risk to RO membranes Chemical dosing required for control Risk to pipes, tanks and equipment The Solution One HydroFLOW® iCustom 16″ unit was installed in May...
Middle East Hospital: 17 Months With No Acid Cleaning

Middle East Hospital: 17 Months With No Acid Cleaning

by Hydropath | Jul 20, 2026 | Case Studies and Results

The Challenge Shutdowns every 3–4 months for acid cleaning Reduced thermal efficiency in heat exchangers Safety risks from chemical handling Seal and gasket wear from cleaning agents The Solution Two HydroFLOW® units — a Pearl Plus on the make-up water line and an...
Minnesota Truck Wash: Boiler Scale Broken, 216% ROI

Minnesota Truck Wash: Boiler Scale Broken, 216% ROI

by Hydropath | Jul 9, 2026 | Case Studies and Results

Case Study from HydroFLOW USA The Challenge Scale persisted despite softening and chemicals Heavy scale coated internal boiler tubes Acid cleaning was being considered Heat transfer efficiency was reduced by scale The Solution One HydroFLOW® i45 unit was installed on...
« Older Entries
Next Entries »
  • 0115 986 9966
  • sales@hydropath.com
  • WhatsApp