Case Study from HydroFLOW Canada Hot water tank limescale at the Redwood Inn Hot water tank limescale was building at around an inch every six weeks in the two 80-gallon tanks at the 92-suite Redwood Inn. Both tanks needed cleaning every six weeks, the drains clogged...
Case Study from HydroFLOW Italy Hotel Legionella control at Grand Hotel Terme di Comano Hotel Legionella control kept failing at Grand Hotel Terme di Comano, a 55-room spa hotel over four floors. Legionella periodically reached 10³ to 10⁴ CFU/L, chlorine and...
Case Study from HydroFLOW USA Hotel hot water flow at 21 GPG in San Antonio Hotel hot water flow was collapsing at a 136-room San Antonio hotel on water of 357 ppm, or 21 grains per gallon. Scale was restricting strainers, showerheads and aerators, low-flow alarms...
Clogged drippers. A well that yields less every year. Acid flushing that never ends. If your farm runs on hard groundwater, every metre between the borehole and the last emitter is under attack from the same dissolved minerals — here is how the right borehole water...
Case Study from HydroFLOW Italy Food plant E. coli reduction on a pilot recirculation loop Food plant E. coli reduction was needed at an Italian producer that wanted to reuse sugary syrup without adding preservatives, while maintaining organic product quality. The...