Case Study from HydroFLOW Chile The Challenge Scale buildup increased pumping energy demand Flowmeters produced inaccurate readings Pipes required costly replacement work Pipe replacement caused water loss and downtime Valves and controls became difficult to operate...
Case Study from HydroFLOW USA The Challenges Low conductivity required to prevent scaling High chemical usage for control Scaling across cooling and washer systems Well supply depletion and wastewater limits The Solution Two HydroFLOW® units (Custom 14″ and...
The Challenge Bacteria and biofouling in membranes Frequent cartridge clogging Regular shutdowns for disinfection Unstable recovery ratios The Solution Three HydroFLOW® i100 units were installed in December 2017 on the 3 inch raw water feed and post high pressure pump...
Case Study from HydroFLOW USA The Challenge Greenhouse irrigation water treatment was needed to lift stem length and quality Cold weather slowed overall rose growth Shorter stems reduced the value of harvested roses Longer, higher value stems were limited Greenhouse...
Case Study from HydroFLOW USA The Challenges Spray nozzles clogged with hard water scale Reclaimed water producing foul odours Uneven water distribution on rinse bars Frequent nozzle maintenance required The Solution One HydroFLOW® i60 and one HS40 unit were fitted to...