Case Study from Hydropath Asia Plate heat exchanger macrofouling on Hong Kong seawater cooling Plate heat exchanger macrofouling was blocking the seawater channels of a Hong Kong building’s PHEs despite screening and chlorination. Mussels and barnacles...
Case Study from HydroFLOW Italy Sulphate scale pump protection on a 700 m mine pipeline Sulphate scale pump blockage was a recurring failure at an Italian gypsum mine: heavy deposits blocked the underground pump’s impellers and the engine overheated as a result....
Case Study from HydroFLOW USA Cooling tower bio-count reduction at a US Southeast office complex Cooling tower bio-count reduction was needed at a 2.3 million square foot complex of six office buildings, more than 50 restaurants and shops and three hotels, without...
Hot water pipework biofouling at the Palace of Parliament Hot water pipework biofouling had built up across both new and decades-old sections of the Palace of Parliament in Bucharest, a building of nine levels above ground, nine below and more than 1,000 rooms. Thick...
Case Study from HydroFLOW Canada Boiler water treatment ROI at a Northview REIT building in Ontario Boiler water treatment ROI had to be proven before Northview REIT would consider a wider rollout. At an 11-storey residential building in London, Ontario, visible scale...