by Hydropath | Jun 4, 2026 | Case Studies and Results
Case Study from HYDROPATH The Challenges High polymer dosing needed on dewatering Risk of floc loss at lower dose Cake dryness to be held near 21% for the THP Centrate quality to stay within process limits The Solution One HydroFLOW® i160 unit was fitted to the...
by Hydropath | Jun 4, 2026 | Case Studies and Results
Case Study from HYDROPATH The Challenges Floc unstable when polymer dosing was reduced High polymer dosing required to hold stability Risk of floc breakdown at lower dosing Belt press operation became unstable The Solution One HydroFLOW® i120 unit was fitted to the...
by Hydropath | Jun 4, 2026 | Case Studies and Results
The Challenges Ferric dosing fixed at 200 ppm High chemical cost and carbon impact System running near operational limits Risk of fines if limits exceeded The Solution Two HydroFLOW® Custom units (12″ and 14″) were fitted to the DAF feed lines in October...
by Hydropath | Jun 4, 2026 | Case Studies and Results
Case Study from HydroFLOW USA The Challenges High algae and biofouling in the baths Heavy chemical dosing required Frequent blowdowns and water usage High TDS, bacteria and algae levels The Solution One HydroFLOW® i150 unit was fitted to a 6″ fibreglass pipe in...
by Hydropath | Jun 4, 2026 | Case Studies and Results
The Challenges High antiscalant chemical dosing required Ongoing chemical costs and monitoring Risk of calcium carbonate scaling in exchangers Continuous adjustments needed The Solution Three HydroFLOW® Custom 24″ units were fitted to the heat exchanger inlet...