Case Study from HydroFLOW USA The Challenge Scale buildup in heaters, fixtures and equipment Frequent cleaning and descaling required Biofilm and scale accumulation in ice machines Ongoing maintenance costs across locations The Solution HydroFLOW® S38 and HS40 units...
Case Study from HydroFLOW Italy The Challenge Irrigation system limescale formed on nozzles, valves and hydraulic rails Spray nozzles blocked frequently as mineral deposits accumulated Sprayers had to be dismantled, chemically cleaned and reassembled Deposits on seals...
Case Study from HydroFLOW Tunisia The Challenge Drip irrigation clogging affected more than 50% of emitters Well restart flushing took 30 minutes or more Weekly flushing and acid injection were required Daily winter restarts increased water loss and labour...
The Challenge High TDS irrigation water from the site’s wells limited germination and yield Underground water carried high salt and calcium levels TDS readings were around 2000–2400 Canal water was not normally available for the comparison plots Poor germination...
Case Study from HydroFLOW USA The Challenge Quarterly tests showed Legionella above the 1 CFU/mL target Average contamination level reached 7 CFU/mL Flushing and equipment replacement were expensive A $75,000 treatment system was being considered The Solution A...