The Challenges Up to 3mm scale on titanium plates Chemical dosing required for operation Cleaning taking 24 to 48 hours Operators aiming to cut material and labour costs The Solution One HM100 unit was fitted to the 4″ seawater inlet pipe about 1 metre before...
The Challenges Scale can reduce FWG efficiency No chemical dosing system installed onboard Manual cleaning increasing downtime Maintenance costs needing reduction The Solution One HM120 unit was fitted to the seawater inlet pipe about 10 metres from the fresh water...
The Challenges FWG opened roughly once per month Cleaning typically took around 24 hours Hard scale deposits held plates together Plate removal required significant force The Solution One HM100 unit was fitted to the FWG inlet pipe about 1 metre before the heat...
The Challenges Weekly condenser cleaning required ATCS balls replaced every 2 months System shutdowns for maintenance Risk of damage and pipe cutting for ball retrieval The Solution Two HydroFLOW® Custom P units were fitted to the cold feed to the condensers in...
Case Study from HYDROPATH The Challenges Severe struvite scale in centrate lines Frequent maintenance and pipe bypassing Scaling reappearing within weeks Limited access for internal inspection The Solution One HydroFLOW® unit was fitted to the sludge feed pipe in an...