Case Study from HYDROPATH Asia The Challenges Hot spring water hardness above 400 ppm Some systems requiring monthly maintenance Scale build-up affecting pumps and piping Spa facilities requiring bacteria control The Solution More than 30 HydroFLOW® units were...
Case Study from HYDROPATH Asia The Challenges Biofilm remaining on condenser tubes Annual tube cleaning required Electro-chlorination and ATCS still in use Chlorine discharge limited to 0.2 ppm The Solution HydroFLOW® treatment was first installed at an initial trial...
Case Study from HYDROPATH Asia The Challenges Condenser tubes needing to stay free of scale Chemical consumption to be reduced Pool and fountain O&M costs needing control Kitchen steamers requiring long maintenance shutdowns The Solution More than 35 HydroFLOW®...
Case Study from HYDROPATH Asia The Challenges High water hardness at 380 ppm causing scale Cooling tower cleaned every two weeks Heat exchanger scaling cutting heat transfer Injection machines overheating frequently The Solution One HydroFLOW® C60 unit was fitted to...
The Challenges Hard deep well water contributing to scale Scaling continuing despite chemical dosing Acid cleaning required every 3 to 6 months Machine stoppages caused by overheating The Solution Three HydroFLOW® units were installed across heat exchangers and...