Hydropath Technology logo
  • Home
  • How It Works
  • Applications
        • Scale & deposits
          • Limescale, gypsum & mineral scale
          • Struvite control
        • Fouling, bacteria & corrosion
          • Biofouling & biofilm control
          • Legionella control
          • Corrosion control
        • Cooling & heating
          • Cooling tower
          • Heat exchangers
          • Boilers & steam
          • Misting & spray systems
        • Wastewater & filtration
          • Flocculation & filtration
          • Dissolved air flotation (DAF)
          • Sludge dewatering, centrifuges & belt presses
          • Reverse osmosis
        • How the signal works →See it proven in the field →
  • Industries
        • Buildings & Facilities
          • Commercial buildings & facilities
          • Hotels
          • Hospitals
          • Data centres
        • Industrial Process
          • Manufacturing, industrial & mining
          • Food & beverage
          • Water & wastewater utilities
        • Specialist Sectors
          • Power Plants
          • Desalination
          • Marine & shipping
          • Agriculture
          • Swimming pools & leisure
        • Case studies by sector →Talk to an engineer →
  • Products
    • Residential
      • Pearl
      • Pearl Plus
      • HS40
    • Commercial
      • C Range
      • K40 Aquaklear
      • P Range
    • Industrial
      • I Industrial Range
      • Custom Range
      • Multihead Range
      • HM Range
    • Monitoring
      • HydroKNCT & Hydropath Care
    • Which unit do I need? Take the 2-minute quiz →Commercial & industrial (UK): contact us for pricing →Outside the UK? Find your distributor →
  • Case Studies
  • Insights
  • About
    • Why Us?
    • Find a Distributor
    • Become a Distributor
  • Shop
  • Contact
MV Hoegh Antwerp: 18 Months, No Cleaning, No Chemicals

MV Hoegh Antwerp: 18 Months, No Cleaning, No Chemicals

by Hydropath | Jun 4, 2026 | Case Studies and Results

The Challenges Scale can reduce FWG efficiency No chemical dosing system installed onboard Manual cleaning increasing downtime Maintenance costs needing reduction The Solution One HM120 unit was fitted to the seawater inlet pipe about 10 metres from the fresh water...
UBC Baton Rouge: Chemicals Replaced, 3x Longer Intervals

UBC Baton Rouge: Chemicals Replaced, 3x Longer Intervals

by Hydropath | Jun 4, 2026 | Case Studies and Results

The Challenges FWG opened roughly once per month Cleaning typically took around 24 hours Hard scale deposits held plates together Plate removal required significant force The Solution One HM100 unit was fitted to the FWG inlet pipe about 1 metre before the heat...
Taj Chandigarh: Scale Controlled on 1000ppm Water

Taj Chandigarh: Scale Controlled on 1000ppm Water

by Hydropath | Jun 4, 2026 | Case Studies and Results

The Challenges Weekly condenser cleaning required ATCS balls replaced every 2 months System shutdowns for maintenance Risk of damage and pipe cutting for ball retrieval The Solution Two HydroFLOW® Custom P units were fitted to the cold feed to the condensers in...
Luton WWTP: No New Struvite Scale in Centrate Lines

Luton WWTP: No New Struvite Scale in Centrate Lines

by Hydropath | Jun 4, 2026 | Case Studies and Results

Case Study from HYDROPATH The Challenges Severe struvite scale in centrate lines Frequent maintenance and pipe bypassing Scaling reappearing within weeks Limited access for internal inspection The Solution One HydroFLOW® unit was fitted to the sludge feed pipe in an...
Texas DAF: 50% Less Chemical, 6x Cleaning Interval

Texas DAF: 50% Less Chemical, 6x Cleaning Interval

by Hydropath | Jun 4, 2026 | Case Studies and Results

Case Study from HydroFLOW USA The Challenges Recirculating wastewater had a murky appearance Microbial contamination causing strong foul odours Chlorine and polymer dosing needing reduction Cleaning and water replacement too frequent The Solution One HydroFLOW® i150...
« Older Entries
Next Entries »
  • 0115 986 9966
  • sales@hydropath.com
  • WhatsApp