Hydropath Technology logo
  • Home
  • How It Works
  • Applications
        • Scale & deposits
          • Limescale, gypsum & mineral scale
          • Struvite control
        • Fouling, bacteria & corrosion
          • Biofouling & biofilm control
          • Legionella control
          • Corrosion control
        • Cooling & heating
          • Cooling tower
          • Heat exchangers
          • Boilers & steam
          • Misting & spray systems
        • Wastewater & filtration
          • Flocculation & filtration
          • Dissolved air flotation (DAF)
          • Sludge dewatering, centrifuges & belt presses
          • Reverse osmosis
        • How the signal works →See it proven in the field →
  • Industries
        • Buildings & Facilities
          • Commercial buildings & facilities
          • Hotels
          • Hospitals
          • Data centres
        • Industrial Process
          • Manufacturing, industrial & mining
          • Food & beverage
          • Water & wastewater utilities
        • Specialist Sectors
          • Power Plants
          • Desalination
          • Marine & shipping
          • Agriculture
          • Swimming pools & leisure
        • Case studies by sector →Talk to an engineer →
  • Products
    • Residential
      • Pearl
      • Pearl Plus
      • HS40
    • Commercial
      • C Range
      • K40 Aquaklear
      • P Range
    • Industrial
      • I Industrial Range
      • Custom Range
      • Multihead Range
      • HM Range
    • Monitoring
      • HydroKNCT & Hydropath Care
    • Which unit do I need? Take the 2-minute quiz →Commercial & industrial (UK): contact us for pricing →Outside the UK? Find your distributor →
  • Case Studies
  • Insights
  • About
    • Why Us?
    • Find a Distributor
    • Become a Distributor
  • Shop
  • Contact
Poland Moulding: Softeners Removed, Cycle Time Cut

Poland Moulding: Softeners Removed, Cycle Time Cut

by Hydropath | Jun 4, 2026 | Case Studies and Results

Case Study from Hydropath Poland The Challenges Scale and biofilm in cooling channels Rotometers requiring monthly cleaning Reduced heat transfer affecting cycle time Increased operating costs The Solution Two HydroFLOW® P120 units and one S38 unit were fitted to...
Ukraine Wave Pool: 60% Less Chlorine, Clear Water

Ukraine Wave Pool: 60% Less Chlorine, Clear Water

by Hydropath | Jun 3, 2026 | Case Studies and Results

Case Study from HydroFLOW Ukraine The Challenges Frequent filter regeneration required High chlorine dosing required Biofilm forming on the water surface Organic particles reducing clarity The Solution One HydroFLOW® unit was fitted before the circulation pump and...
India Pool: 60% Water Saved, 55% Chemical Saved

India Pool: 60% Water Saved, 55% Chemical Saved

by Hydropath | Jun 3, 2026 | Case Studies and Results

The Challenges Backwashing required every 48 hours High chlorine dosing required Strong chlorine odour present Algae growth affecting water clarity The Solution One HydroFLOW® P-160 unit was fitted before the pump on 130mm GI pipe in August 2019, serving two pools of...
Colmar Pool: 2,535m³ Water Saved, 0.7-Year ROI

Colmar Pool: 2,535m³ Water Saved, 0.7-Year ROI

by Hydropath | Jun 3, 2026 | Case Studies and Results

Case Study from HydroFLOW France The Challenges High backwash water consumption per wash 78 filter washes per year Heated chlorinated water wasted during washes Rising operating costs from water and energy use The Solution One HydroFLOW® P160 unit was fitted upstream...
Arizona Chillers: 68% Less Blowdown, Less Chemical

Arizona Chillers: 68% Less Blowdown, Less Chemical

by Hydropath | Jun 3, 2026 | Case Studies and Results

Case Study from HydroFLOW USA The Challenges High water use from blow-down cycles Continuous chemical dosing required Water scarcity affecting operations Need to stay within industry standards The Solution One HydroFLOW® i8″ Custom unit was fitted to the...
« Older Entries
Next Entries »
  • 0115 986 9966
  • sales@hydropath.com
  • WhatsApp