Case Study From Maimtec Data centre cooling water treatment without chemicals Data centre cooling water treatment had to solve a limescale problem at an Amsterdam data centre, where scale on the spray nozzles, cooling packs and pipework of six BAC cooling towers was...
Case Study from Hydropath Asia Power plant condenser scale on 1,800 mm cooling lines Power plant condenser scale had left a Chinese power station heavily dependent on anti-scaling and biocide chemicals to protect its steam condensers. Seasonal river water, with high...
Case Study from HydroFLOW Italy Fish farm UV replacement at a seawater farm near Rome Fish farm UV replacement was the aim at Civitavecchia Fish Farm, a seawater aquaculture facility near Rome. Its UV systems cost around €1,100 a month each to run and still struggled...
Case Study from HydroFLOW Chile Boiler heat exchanger scale is a constant risk on very hard water, and in a 140 m² home in eastern Santiago the supply had gone from below 425 ppm to around 500 ppm. The domestic boiler served three bathrooms and a kitchen, and had...
Case Study from Hydropath Dairy heat exchanger scale on the Tims Dairy milk line Dairy heat exchanger scale was forcing Tims Dairy to acid-clean its milk line twice a week, each time with a full dose of phosphoric acid and a production stop. Milk scale was...