Key results
0 Chemical dosing
1 kPa Vacuum pressure increase
1.5°C transit temperature drop

Summary

Two units on 1,800 mm lines allowed anti-scaling and biocide dosing to stop one week after installation, and inspection after three months found no hard scale in the steam condenser, only soft scale that could be washed away with water jets. Steam condensation improved, with vacuum pressure up 1 kPa and transit temperature held at 4°C to 5°C instead of 5°C to 6°C, and cooling tower discharge water was used on site for gardening and other applications.

Case Study from Hydropath Asia

Power plant condenser scale on 1,800 mm cooling lines

Power plant condenser scale was a concern at a Chinese power station with two 600 MW units, which relied on anti-scaling and biocide chemicals to protect its steam condensers. River water quality varied by season, with high turbidity in the summer rainy period. The site wanted to reduce chemical use and improve steam condensation efficiency. In November 2016 two HydroFLOW® Multihead 72 inch units were fitted to the 1,800 mm pipes of the steam condenser system. Chemical dosing was stopped one week after installation, and inspection after three months found no hard scale, only soft powder scale that could be washed down with water jets. Cooling tower discharge water was used on site for gardening and other applications.

The Challenge

  • Power plant condenser scale was managed with anti-scaling and biocide dosing
  • Seasonal river water brought high turbidity in the rainy season
  • Steam condensation efficiency needed improvement

The Solution

  • Unit installed: two HydroFLOW® Multihead 72 inch units
  • Installation point: main pipes of the steam condenser system
  • Pipe size: 1,800 mm
  • Installed: 7 November 2016
  • Dosing stopped: anti-scaling and biocide chemicals

With the HydroFLOW® treatment in place, inspection after three months found no hard scale inside the steam condenser, only soft powder scale that could be washed down with water jets. Chemical dosing was stopped one week after installation, and cooling tower discharge water was used on site for gardening and other applications.

Key Outcomes

R

Chemical dosing stopped 1 week after install

R

Condenser vacuum pressure rose by 1 kPa

R

Transit temperature dropped from 5–6°C to 4–5°C

R

No hard scale found at 3-month inspection

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Ready to see more?

Ready to explore sustainable water treatment?

Get in touch to find out how HydroFLOW® can work for you.

© 2026 Hydropath Technology Ltd. All rights reserved