Cooling tower blowdown reduction at a Fortune 100 headquarters
Cooling tower blowdown reduction was a priority at the headquarters campus of a Fortune 100 company, where scale and biofouling were affecting cooling efficiency, with high chemical dosing, frequent maintenance and high blowdown water consumption. In April 2016 HydroFLOW® Custom units were installed across the cooling towers and chillers as part of a Total Water Management programme including monitoring, optimisation and ongoing system analysis. Blowdown fell by 85%, chemical use by 75% and maintenance frequency by 50%, energy consumption fell by 10%, and annual savings reached $73,400.
The Challenges
- Cooling tower blowdown reduction was a priority as scale and biofouling built up across the plant
- High chemical dosing was required to keep the system under control
- Maintenance and blowdown were both frequent
- Ongoing maintenance and energy costs
The Solution
- Units installed: HydroFLOW® Custom units
- Installation point: across the cooling towers and chillers
- Installed: April 2016
- System: treated under a Total Water Management programme
The units went in across the towers and chillers as part of the Total Water Management programme. Cooling tower blowdown reduction reached 85%, chemical use fell by 75% and maintenance frequency by 50%, and scale and biofouling accumulation was reduced.