Case Study from HYDROPATH Asia
The Challenges
- Scale build-up affecting condenser performance
- Annual condenser tube cleaning required
- Continuous chemical dosing in use
- Bleed-off needed to control conductivity
The Solution
HydroFLOW® units were installed on cooling water systems during a 2013 pilot at Lok Fu Plaza, then rolled out widely, with condenser tubes not cleaned beforehand. The signal disrupts the conditions that bond scale to surfaces, removing remaining scale within 12 months.