No scale return was observed after chemicals were stopped, and no chemicals were used for 9-10 months. Deposits became soft and easy to remove with a water hose, inspection found no significant scale or biofouling, and a 2019 review found the tower and the i160 in excellent condition.

Case Study from HydroFLOW USA

A chemical free cooling tower at Nellis Air Force Base

Nellis Air Force Base used cooling tower 11 to evaluate whether it could run as a chemical free cooling tower, and how scale behaved without chemicals. The tower depended on treatment chemicals to control scale and biofouling, and deposits adhered inside it and were difficult to remove. One HydroFLOW® i160 was fitted to the tower for a six-month evaluation. Existing deposits became soft and easy to remove, no chemicals were used for 9-10 months, and no return of scale was observed after the chemicals were stopped. A 2019 review found the tower and the i160 in excellent condition.

The Challenges

  • A chemical free cooling tower was the objective, but chemical treatment was required for control
  • Scale and biofouling were both a risk
  • Deposits were adhering inside the tower
  • The base was dependent on treatment chemicals

Cooling tower basin before and after treatment at Nellis Air Base

The Solution

  • Unit installed: one HydroFLOW® i160
  • Installation point: cooling tower 11
  • Trial: six months
  • Dosing stopped: chemical treatment, for the whole evaluation

The i160 was fitted to tower 11 and chemical dosing was stopped for the evaluation. Existing deposits became soft and easy to remove, and loose deposits of up to 6 inches were removed with a water hose. No return of scale was observed after the chemicals were discontinued, tower 11 ran as a chemical free cooling tower with no chemicals used for 9-10 months, and a 2019 review found the tower and the i160 operating in excellent condition.

Key Outcomes

R

No chemicals used for 9 to 10 months

R

Loose deposits removed easily with a water hose

R

No biofouling or scale return observed

R

Tower and unit excellent at 2019 review

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Ready to see more?

Ready to explore sustainable water treatment?

Get in touch to find out how HydroFLOW® can work for you.

© 2026 Hydropath Technology Ltd. All rights reserved