The Challenges CIP chemical cleaning needed every 10 to 12 days FWG opened monthly for manual cleaning Scale, bacteria, algae and slime causing fouling Chemicals used for dosing and plate cleaning The Solution One HM-100 unit was fitted to the seawater inlet pipe...
Case Study from HYDROPATH Asia The Challenges Biofilm remaining on condenser tubes Annual tube cleaning required Electro-chlorination and ATCS still in use Chlorine discharge limited to 0.2 ppm The Solution HydroFLOW® treatment was first installed at Exchange Square...
Case Study from HYDROPATH Asia The Challenges Condenser tubes needing to stay free of scale Chemical consumption to be reduced Pool and fountain O&M costs needing control Kitchen steamers requiring long maintenance shutdowns The Solution More than 35 HydroFLOW®...
Case Study from HYDROPATH Asia The Challenges Scale build-up affecting condenser performance Annual condenser tube cleaning required Continuous chemical dosing in use Bleed-off needed to control conductivity The Solution HydroFLOW® units were installed on cooling...