Case Study from Hydropath Poland The Challenges Scale and biofilm in cooling channels Rotometers requiring monthly cleaning Reduced heat transfer affecting cycle time Increased operating costs The Solution Two HydroFLOW® P120 units and one S38 unit were fitted to...
Case Study from HydroFLOW USA The Challenges Chemical treatment required continuously Risk of scale at high conductivity Cooling tower blowdown limited Scale threatening chiller efficiency The Solution One HydroFLOW® unit was fitted to the cooling tower condenser loop...