The Challenges Hard deep well water contributing to scale Scaling continuing despite chemical dosing Acid cleaning required every 3 to 6 months Machine stoppages caused by overheating The Solution Three HydroFLOW® units were installed across heat exchangers and...
Case Study from Hydropath Poland The Challenges Scale and biofilm in cooling channels Rotometers requiring monthly cleaning Reduced heat transfer affecting cycle time Increased operating costs The Solution Two HydroFLOW® P120 units and one S38 unit were fitted to...
Case Study from HydroFLOW USA The Challenges Chemical treatment required continuously Risk of scale at high conductivity Cooling tower blowdown limited Scale threatening chiller efficiency The Solution One HydroFLOW® unit was fitted to the cooling tower condenser loop...
Case Study from HydroFLOW South Africa The Challenges Hard scale on tubes and internal panels Heavy deposits on spray nozzles and frames Reduced heat transfer efficiency Reliance on continuous chemical dosing The Solution One HydroFLOW® i120 unit was fitted to the...