Case Study from HYDROPATH Asia Seawater cooled chiller biofilm across five buildings Seawater cooled chiller biofilm remained on the condenser tubes of five Hong Kong commercial buildings, even though all of them ran electro-chlorination and automatic tube cleaning....
Case Study from HYDROPATH Asia A large site water treatment rollout across a theme park A large site water treatment rollout was needed at a Hong Kong theme park with two on-site hotels, where scale affected almost every water system it ran. The problem reached the...
Case Study from HYDROPATH Asia A moulding softener alternative on 380 ppm water A moulding softener alternative was needed at a Thai injection moulding plant running on water at 380 ppm hardness. The cooling tower was cleaned every two weeks, the heat exchanger was...
Mould cooling water scale across 40 machines Mould cooling water scale was building up at a Philippine injection moulding plant running 40 machines and four cooling towers on hard deep well water. Scaling continued despite chemical dosing, acid cleaning was needed...
Case Study from Hydropath Poland Injection moulding cycle time and cooling channel scale Injection moulding cycle time was stretching at a Polish plant because scale and biofilm in the mould cooling channels were cutting heat transfer. Rotometers needed cleaning every...