The Challenges
- Scale building up on FWG heat exchanger plates
- Water production reduced to around 17 m3/day
- Manual scraping risking plate damage
- Cleaning downtime needing reduction
The Solution
One HM120 unit was fitted to the seawater inlet pipe to the fresh water generator in January 2015. The signal disrupts the conditions that bond scale to surfaces, so deposits detach easily at cleaning and the risk of plate damage drops.
