The Challenges FWG opened roughly once per month Cleaning typically took around 24 hours Hard scale deposits held plates together Plate removal required significant force The Solution One HM100 unit was fitted to the FWG inlet pipe about 1 metre before the heat...
Case Study from HydroFLOW USA The Challenges Recirculating wastewater had a murky appearance Microbial contamination causing strong foul odours Chlorine and polymer dosing needing reduction Cleaning and water replacement too frequent The Solution One HydroFLOW® i150...
Case Study from HydroFLOW USA The Challenges High algae and biofouling in the baths Heavy chemical dosing required Frequent blowdowns and water usage High TDS, bacteria and algae levels The Solution One HydroFLOW® i150 unit was fitted to a 6″ fibreglass pipe in...
The Challenges Scale and biofouling affecting boilers Chemical dosing regularly required Limited equipment protection Chemical dosing conflicting with sustainability goals The Solution Two HydroFLOW® I-120 units were installed on the boiler systems at the North and...
Case Study from HYDROPATH Asia The Challenges Biofilm remaining on condenser tubes Annual tube cleaning required Electro-chlorination and ATCS still in use Chlorine discharge limited to 0.2 ppm The Solution HydroFLOW® treatment was first installed at Exchange Square...