Hong Kong PHE: Treated Clear, Untreated Blocked 3 ft

Home 9 Case Studies and Results 9 Hong Kong PHE: Treated Clear, Untreated Blocked 3 ft
Key results
Treated PHE largely unblocked
Untreated blocked to 3 ft
14-18% higher seawater flow

Case Study from Hydropath Asia

The Challenge

  • Plate heat exchanger macrofouling kept blocking the seawater channels despite screening and chlorination
  • Mussels and barnacles restricted the seawater channels
  • Biofilm impaired heat rejection across the PHE plates
  • Higher differential pressure increased pumping demand
  • Discharge limits restricted how much residual chlorine could be used


The Solution

A HydroFLOW® unit was first fitted at the PHE02 inlet. After upstream fouling was identified, a HydroFLOW® custom 24 inch unit was repositioned to the header-pipe outlet to PHE02 to extend treatment across the affected pipework, with untreated PHE01 as the comparator from 22 February to 30 August 2023. After six months the treated PHE02 water channel remained largely open while untreated PHE01 was blocked to a depth of 3 ft. Biofilm on PHE02 was visibly thinner, differential pressure was lower, and it maintained 14–18% higher seawater flow.

Key Outcomes

R

Final inspection found far less water-channel blockage in treated PHE02

R

PHE02 remained largely open while PHE01 was blocked to a depth of 3 ft

R

After six months, biofilm on treated PHE02 was visibly thinner than on untreated PHE01

R

Treated PHE02 maintained 14–18% higher seawater flow and lower differential pressure

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.