Case Study from HydroFLOW Italy The Challenge Water hardness of approximately 840 ppm CaCO₃ Scaling risk to RO membranes Chemical dosing required for control Risk to pipes, tanks and equipment The Solution One HydroFLOW® iCustom 16″ unit was installed in May...
The Challenge Shutdowns every 3–4 months for acid cleaning Reduced thermal efficiency in heat exchangers Safety risks from chemical handling Seal and gasket wear from cleaning agents The Solution Two HydroFLOW® units — a Pearl Plus on the make-up water line and an...
Case Study from HydroFLOW USA The Challenge Scale persisted despite softening and chemicals Heavy scale coated internal boiler tubes Acid cleaning was being considered Heat transfer efficiency was reduced by scale The Solution One HydroFLOW® i45 unit was installed on...
Case Study from HydroFLOW USA The Challenges Spray nozzles clogged with hard water scale Reclaimed water producing foul odours Uneven water distribution on rinse bars Frequent nozzle maintenance required The Solution One HydroFLOW® i60 and one HS40 unit were fitted to...
The Challenges Weekly condenser cleaning required ATCS balls replaced every 2 months System shutdowns for maintenance Risk of damage and pipe cutting for ball retrieval The Solution Two HydroFLOW® Custom P units were fitted to the cold feed to the condensers in...