Case Study from HYDROPATH Asia The Challenges High water hardness at 380 ppm causing scale Cooling tower cleaned every two weeks Heat exchanger scaling cutting heat transfer Injection machines overheating frequently The Solution One HydroFLOW® C60 unit was fitted to...
The Challenges Hard deep well water contributing to scale Scaling continuing despite chemical dosing Acid cleaning required every 3 to 6 months Machine stoppages caused by overheating The Solution Three HydroFLOW® units were installed across heat exchangers and...
Case Study from Hydropath Poland The Challenges Scale and biofilm in cooling channels Rotometers requiring monthly cleaning Reduced heat transfer affecting cycle time Increased operating costs The Solution Two HydroFLOW® P120 units and one S38 unit were fitted to...
Case Study from HydroFLOW USA The Challenges High water use from blow-down cycles Continuous chemical dosing required Water scarcity affecting operations Need to stay within industry standards The Solution One HydroFLOW® i8″ Custom unit was fitted to the...
Case Study from HydroFLOW USA The Challenges Scale and biofouling building up in the system High chemical dosing required Frequent maintenance and blowdown Ongoing maintenance and energy costs The Solution HydroFLOW® Custom units were installed across the cooling...