
Guelph WWTP: Belt Press Downtime Cut From 3 Days to 6 Hours
A HydroFLOW® i160 stopped new struvite on a Guelph WWTP belt press for 60+ days and cut maintenance downtime from three days to six hours.
Discover how Hydropath® technology delivers sustainable, chemical-free water treatment across industries and continents.

A HydroFLOW® i160 stopped new struvite on a Guelph WWTP belt press for 60+ days and cut maintenance downtime from three days to six hours.

A HydroFLOW® i160 kept centrifuge ports and centrate pipework clear of struvite at Hamilton’s Woodward Avenue WWTP, with payback under a year.

A HydroFLOW® i160 kept HERA’s Bologna sludge shredder running for at least 65 days without a struvite stoppage, against 20 to 30 days before.

The J. P. Messerly plant in Augusta cut anti-scalant dosing to zero on two belt presses with one HydroFLOW® i160, saving roughly $4,000 a month.

Orlando's Water Conserv II ran belt press No. 5 for 150 days without cleaning, cutting pan scale from 5 mm to 1 mm and polymer use by around 20%.

The City of London Wastewater Department cleared over half its belt press first-roller holes in a 35 day trial, with no chemical or mechanical cleaning.

A Utah plant stopped $8,000 a month of struvite chemical and cut screw press cleaning from 30 hours to under four with one HydroFLOW® Custom 8 inch unit.

Denver's Robert W. Hite Treatment Facility softened heavy transfer pump struvite over 60 days, then installed four more HydroFLOW® units.

Tulsa Southside WWTP kept a cleaned belt press drum free of new struvite for 90 days, then funded treatment for the header serving all five presses.
Get in touch to find out how HydroFLOW® can work for you.
© 2026 Hydropath Technology Ltd. All rights reserved